Most of the guides on this subject are written by builders selling fit-outs, or lenders selling loans. The maths looks tidy. The chairs look clean. The patient build curve, in those pages, always ends with the words “on track”. We thought a page from people who have run the practices rather than fitted them might be more useful.
01 — Decide what you are actually doing
Three routes, and the one most people pick for the wrong reason
Before any conversation about equipment or location, there is a cleaner conversation about which of three things you are doing. One: open from zero in a shell nobody has used for dentistry (a squat). Two: take over an existing dental lease and refit (a leasehold takeover).
Three: buy a going concern. The numbers, the risk, and the hours required are quite different, and the honest answer about which is right for you often has less to do with capital than with how much appetite you have for recruiting a patient list from zero.
A squat has the lowest upfront purchase and the highest patient-build risk. You buy the walls and the chairs; the chairs arrive empty. A takeover takes a shell that has been dentistry before, usually at a lower fit-out cost per square metre, but inherits whatever reputation sat in it before. A going-concern purchase is the most expensive at the point of sale and the least risky in year one; you have patients from day one, including some who will leave when you arrive, and the question becomes how many stay and whether what you have paid reflects it. For a longer treatment of the going-concern path, our buying your first dental practice guide covers that side.
Most first-time owners pick a squat because they think it is cheaper. Sometimes it is, measured only on the purchase line. On the full three-year picture, including the twelve to eighteen months of thinner revenue while the list builds, the three routes often cost more similar amounts than owners initially expect. The decision is better made on patient-building appetite than on sticker price.

02 — The real money picture
What a squat practice actually costs
The honest range we see for a UK two-surgery squat sits somewhere between £200,000 and £350,000 fully loaded, with four-surgery or London fit-outs pushing considerably higher. The spread is wide because the number is less about dentistry and more about three things: how much of the shell needs structural work before clinical fit-out starts, how good the chairs and the imaging are, and how long the working capital has to carry the business before fees start covering the overhead.
The line most first-time owners under-budget is not equipment. It is the working capital. From signing the lease to seeing the first patient is usually six to nine months. From seeing the first patient to covering monthly running costs from fees alone is usually another twelve to eighteen months.
That is up to two years of overheads met out of borrowing or savings rather than revenue, and the overheads are not small: rent, rates, loan servicing, principal’s drawings or associate retainer, nurse salary, defence subs, insurance, software subscriptions and compliance. Our rough rule of thumb is to budget twelve months of working capital on top of the fit-out, and to be grateful when you only use six.
Lenders usually want 10 to 25 per cent of the total project as cash equity, with the loan secured against the business and often a personal guarantee against the dentist. The dentists who make this part work usually have at least £40,000 to £80,000 of their own cash available on top of the loan, and a very clear understanding that the first drawings they take from the business will be smaller than what they were earning as an associate.
Indicative ranges from active 2024 to 2026 UK projects. Your project will differ based on surgery count, location, specification and condition of the shell.

03 — The twelve to eighteen months that matter
A sequence that holds
Site, lease and finance (months one to three)
The decisions you make in the first ninety days drive almost everything after. Lease length and dilapidations are the hidden cost nobody mentions in month one and everybody discovers in month sixty. A good commercial dental lease runs ten to fifteen years with a tenant-only break and a dilapidations cap.
Signing a five-year lease because it feels less committing is usually a mistake; you will not have paid back the fit-out by year five. Finance in parallel: broker in the dental specialist space, not a high-street branch, and a lender who understands dental cash flow curves rather than one who tries to apply retail or hospitality assumptions.
Design, CQC and build (months three to six)
The practical sequence is architect and principal designer appointed, drawings signed off, CQC registration started in parallel, equipment ordered on confirmed lead times, build begins. CQC is the longest pole in the tent and the one that catches most people out: expect the registered manager process alone to take three to four months from submission, and start the clock the day the design is agreed, not the day the build finishes.
Team, systems and launch (months six to nine)
Hire the practice manager first, before the nurses. The practice manager will hire the rest better than you will, and the two of you will set every system together. Patient management software choice is where many first-time owners spend too long on cost and not enough on how the software will shape the next ten years of workflow.
Pre-launch marketing starts around month seven: landing page, listing claims, local PR angle, open day planning. The business that wins the first six months is usually the one that treats pre-launch as a serious project rather than an afterthought.
The first twelve months of trading
Patient build in month one is almost always slower than the plan said. Month three to month six is where the honest curve starts. Full chair utilisation on a well-marketed single-surgery squat typically arrives somewhere between month twelve and month eighteen; a four-surgery squat takes longer because you need patient volume across more diaries.
The practices that fail at this stage usually fail for one of three reasons: they ran out of working capital, they could not keep the team through the thin months, or the owner panicked and dropped fees. Any of those will undo the business. All three together will close it.

04 — Mistakes we have watched
Five that come up again and again
Buying all the kit on day one
The CBCT, the Itero, the laser. A full equipment stack purchased before there is a patient list to use any of it on. Phase the equipment to the workload. If the implant case volume is not there in year one, the CBCT can wait until it is.
Underpaying the practice manager
The salary gap between a dental practice manager who can run the business and one who can keep the diary tidy is usually £10,000 to £15,000 a year. The gap in what the practice looks like after two years is far larger. Pay for the real one.
Opening without a patient journey
Opening day arrives, the chairs work, the receptionist smiles. There is no treatment coordinator role, no case presentation protocol, no clear “new patient within four touches” journey. Within six months the owner is wondering why cases are not accepting at the rate the fee list implies. The journey has to exist before the first patient walks in, not after.
Discounting under pressure
Fees quietly drift down in month four or five because the diary looks thin. The owner tells themselves it is temporary. It is almost never temporary. Patients who paid the first fee feel cheated when they hear a friend got a lower one, team confidence slips, and the fee list that was set carefully in month one becomes negotiable in month seven. Hold the price. Fill the diary a different way.
The dentist as practice manager
In month three it feels efficient for the principal to do the ordering, the invoices and the staff rota alongside clinical work. By month twelve the clinical day has been eroded, the admin is still half-done, and the practice has lost its most expensive hour to its least leveraged work. Hire the role or outsource the role. Do not become it.

05 — What we would plan if we were doing this today
A short list, kept short on purpose
A two-surgery squat in a market where there is clear demographic headroom for private dentistry, taken out on a fifteen-year lease with a tenant-only break at year five. Fit-out at the sensible end rather than the premium end, with a design that lets you add a third surgery inside the shell when year two allows it.
CBCT phase two, not phase one. A practice manager hired before the nurses. A treatment coordinator role designed and recruited for before week one of trading. Pre-launch marketing started six months before the opening date. Twelve months of working capital in the bank at opening. A pricing structure that respects the market and does not move for the first eighteen months.
We would also hire a coach or a mentor for the first eighteen months. Not out of self-interest; out of what we watched other people wish they had done. The practices that reach month twenty-four in the state the business plan promised are overwhelmingly the ones where the owner had a weekly or fortnightly conversation with someone outside the business who had done it before. More on how that works in the business coaching guide and in practice coaching.

06 — If this is a serious conversation
What to do next
If you are at the stage of modelling numbers and comparing sites, the piece of work that pays for itself is a proper feasibility exercise before you commit to the lease. A good one tests the demographics, the fee model, the fit-out budget and the twelve-month patient build curve against reality. We cover that under consulting and separately through dental business consultant engagements.
If you would like a first conversation about whether a squat is the right route for your situation, the phone number below is answered by someone who will tell you honestly if we think it is not.
The role we have not spoken about above but which belongs in the first six months of any new practice is the practice manager. The person who keeps the compliance diary current, the rota holding together, and the owner out of operational firefighting.
The first associate hire into a new practice is one of the highest stakes decisions in the opening twelve months. We cover the owner side of that conversation separately in associate dentist recruitment.
Rahul and Bhavna Doshi, Dental Wealth Builder
Call 01992 878030


